USA - Hawaii Camp
2022-07-21
Project Address
USA
Number of modules
21
Project Cycle
6 months


The project consists of 16 40'HQ container houses, 4 packing boxes, 1 40'HQ shipping container, 100mm rock wool color steel sandwich panels for insulation. However, the plumbing and electrical materials are strictly required, especially the electrical materials, which need to meet UL certification. Water pipes need to meet UPC certification.

Industrial water heaters, washing machines, dryers, air conditioners and other electrical appliances need to be installed, and furniture needs to be installed.





If you have any questions
please feel free to contact us at any time
MESSAGE
Back to top